SpectraLink 8000 SVP Server: Administration Guide for SRP
A maximum distance of 325 feet (100 meters) from the Ethernet
switch.
Install the SVP Server
The SVP Server may be mounted on a rack or to a wall.

Mount the SVP Server on a rack

The rack mount kit is designed for mounting equipment in a standard
19” rack and should contain the following equipment:
Mounting plates– two for each SVP Server to be mounted.
Screws– four rack mount screws for each SVP Server to be
mounted.
To rack-mount the SVP Server:
1. Remove the corner screws from the SVP Server
2. Screw the U-shaped end (round screw holes) of the two mounting
plates to the SVP Server.
3. Screw the other end of the two mounting plates (oblong screw
holes) to the rack.
4. Repeat steps 1-3 for each additional SVP Server. The mounting
plate is designed to provide the correct minimum spacing
between units. When mounting multiple units, stack the units in
the rack as closely as possible.

Mount the SVP Server to a wall

The SVP Server can be mounted either horizontally or vertically.
To mount the SVP Server:
1. Using a 1/8-inch drill bit, drill four pilot holes, on 1.84-inch by
12.1-inch centers (approximately equivalent to 1-13/16” by
12-1/8”).
2. Insert the #8 3/4-inch screws in the pilot holes and tighten,
leaving a 1/8-inch to 1/4-inch-gap from the wall.
PN: 1725-36032-001_F.doc
16