Powermate P-WB-163150 Operation Continued • Save all instructions, C How to Stop the Blower

Models: P-WB-163150 P-WB-163150-[E]

1 44
Download 44 pages 61.75 Kb
Page 11
Image 11
Operation (Continued)

Operation (Continued)

• Save all instructions

C How to Stop the Blower

Move the ON/OFF Switch to the OFF position. (See figure 6)

D How to Adjust the Vertical Flow Angle

The vertical air flow direction can be adjusted between 3 positions: Straight (level), 15 degrees upward, and 15 degrees downward. Refer to Figure 8 when performing the adjustment steps below:

1.Stop the engine.

2.Pull the index lever out of its existing hole.

3.Rotate the index lever to the desired position.

4.Release the index lever and allow it to insert into the desired hole.

C How to Stop the Blower WARNING

Never adjust the flow angle when engine is running. Never stand or put your hand in front of the discharge opening when the engine is running. Never put hands, fingers, or anything else inside the discharge opening when the engine is running. There are rotating blades inside which can cause serious injury.

15° Downward

 

 

Level

 

Air Flow

 

 

15° Upward

 

Louver

 

 

 

Adjustment

 

 

Lever

Figure 8

 

 

E How to Redirect Air Flow toward the Front

A Front Flow Attachment is included with your blower. Assembling this attachment to the blower will cause the air flow to

be redirected to the front of the blower.

 

 

 

 

To assemble this attachment to the blower, follow the steps

 

 

 

below and refer to Figure 9:

 

 

 

 

 

1.

Stop the engine.

 

 

 

 

Bolt

2.

Rotate the vertical adjustment lever to the level position

 

 

Slot

 

(See Figure 8)

 

 

 

 

3.

Loosen the attachment knob located on top of the blower

Front Flow

Attachment

 

discharge chute

 

 

4.

Orient the attachment so the “This Side Up For USE” is up.

Discharge

 

 

5.

Slide the front flow attachment over the discharge

Chute

 

 

 

chute with the orientation identified on the label. The slot

 

 

 

 

on the top of the front flow

attachment will

mate

 

 

 

 

 

 

 

 

with the bolt of the attachment knob.

the

 

 

 

6. Hand-tighten the attachment

knob to secure

 

 

 

 

attachment.

 

 

Attachment

Note: when properly assembled, the attachment knob will fit

Knob

Round

inside of the round emboss on the top of the attachment.

 

 

 

 

Emboss

Figure 9

Questions? Call Toll Free at 1-800-737-2112

10

Copyright © 2009 MAT Engine Technologies, LLC

Page 11
Image 11
Powermate P-WB-163150 Operation Continued • Save all instructions, C How to Stop the Blower, Questions? Call Toll Free at