Ceiling Anchoring
THE
Truss | Concrete | Wood |
| Truss |
|
|
| Concrete |
|
| Wood Joist |
|
| Eye Lag Hole |
| Loop | Eye Lag Hole |
|
| Loop |
| Braided Cable |
|
|
| Braided Cable |
Truss ceiling
Step 1. Loop the braided cable around the truss.
Step 2. Run the open end through the loop.
Step 3. Pull the open end down until the braided cable tightens around the truss.
Concrete
Step 1. Determine the mounting location.
Step 2. Use a 1/4” masonry drill bit to
Step 3. Place the concrete anchor into the
Wood joist
Step 1. Secure the four (4) ¼” eye lag screws to the wood joist in the ceiling.
Step 2. Make sure eye lag screws are properly secured to the joistbeforesecuringthecable to the cable locks on the plate.
Step 3. Run the open end through the hole in the eye lag screw.
Step 4. Run the open end through the loop.
Step 5. Pull the open end down until the braided cable tightens around the eye lag screw.
Installation Instructions | Page 7 |