Pressure Systems 9016 manual Final Installation, Final Checkout

Models: 9016

1 13
Download 13 pages 44.31 Kb
Page 12
Image 12

Pressure Systems, Inc.

9016 Upgrade Instructions

Final Installation

(1)Carefully reinstall the module into the housing, aligning the retaining pins in the housing with holes in the brackets on your PC-322/323 boards. Ensure that none of the wiring harnesses or nylon tubing are pinched. Ensure the Viton® gasket is flat between the two surfaces and is without folds. Tighten the three screws for this PC-323 board.

(2)Re-install the twelve (12) Phillips-head screws around the top plate perimeter.

(3)Install the upgrade kit tag on the end of your scanner, just below the serial number/nameplate. The tag is designed to fit directly beneath the nameplate. Clean the surface of the with isopropyl alcohol to achieve good adhesion. Peel off the protective covering layer of double-faced tape and position the sticker as described above.

Final Checkout

Test your Intelligent Pressure Scanner for proper operation. For operation of your newly upgraded Intelligent Pressure scanner, please refer to your 9116 User’s Manual, available from the Pressure Systems web site, www.PressureSystems.com.

11www.PressureSystems.com

Page 12
Image 12
Pressure Systems 9016 manual Final Installation, Final Checkout