TURBOPOWER 99 WATER HEATER
TABLE OF CONTENTS
1.Safety Considerations
2.Product Descriptions
3.Standard Features and Equipment
3.1Warranty
4.Water Heater Installation
4.1Checking Equipment Before You Install
4.2Codes
4.3Electrical Requirements
4.4Location
4.5Installation
4.6Service Clearances
4.7Clearances to Combustible Surfaces
5.Condensate Neutralization & Disposal
6.Combustion and Ventilation Air
7.Vertical and Horizontal Remote Air
7.1Vertical or Horizontal Remote Air Option
7.2Remote Air Piping Design
7.3Maximum Allowed Combustion Air Vent Length (Equivalent Length)
7.4Remote Air Piping of Multiple Units
8.Venting Products of Combustion
8.1Vent System Design
8.2Venting of Multiple Units
8.3Maximum Allowed Vent Length (Equivalent Length)
8.4Vent Construction and Assembly
8.5Horizontal and Vertical Venting Through a Wall or Roof
9.Gas Supply and Piping
9.1Inlet Pressure
9.2Manifold Pressure
9.3Gas Piping Size
9.4Appliance Isolation during Gas Supply Piping Pressure Test
9.5Gas Connection
9.6Gas Train and Controls Certification
9.7Gas Control Trains
10.General Information
10.1Temperature and Pressure Relief Valve(s)
10.2Upper LED Readout
10.3High Water Temperature Limit Control
10.4Cathodic Protection
10.5Thermal Expansion
11.TempTrac Electronic Controller Panel
11.1Principle of Operation
11.2Lower LED Readout
11.3Upper LED Readout
11.4Control Buttons
11.5To View the Setpoint
11.6To Change the Setpoint
11.7To Change Other Parameters
11.8LED Display Alarm Messages
12.Remote Connections – Terminal Strip
13.Start-up Procedure
14.Periodic Maintenance
15.Diagrams
Warranty forms ship separately with each product.
2 |