Troubleshooting
Specifications
Install
Error codes
Replacement Parts
Maintenance
Problem
16.3Burner Assembly
14.5Startup Procedure
Fault Mode
Page 32
Image 32
16.1 Control Panel
32
PV500-47C
06/12
Page 31
Page 33
Page 32
Image 32
Page 31
Page 33
Contents
PV500-47C06/12
INSTALLATION & MAINTENANCE MANUAL
TRICON WATER HEATER
TABLE OF CONTENTS 1.Safety Considerations
2.Standard Features and Equipment
4.Water Heater Installation
3.Product Descriptions
10.Operating and Safety Controls
15.Troubleshooting Guide 16.Replacement Parts
17.Periodic Maintenance
18.Recommended Maintenance Schedule
PV500-47C06/12
1 SAFETY CONSIDERATIONS
PRODUCT SAFETY INFORMATION
HOMES FOR THE MENTALLY HANDICAPPED
HOMES FOR THE PHYSICALLY HANDICAPPED
HOSPITALS AND NURSING HOMES
ELDER CARE FACILITIES AND REST HOMES
2 STANDARD FEATURES AND EQUIPMENT 2.1Performance
2.2Pressure Vessel
2.3Heat Exchanger
2.4Codes And Standards
250 SERIES
PV500-47C06/12
300 SERIES
PV500-47C06/12
4 WATER HEATER INSTALLATION
4.1Checking Equipment Before You Install
4.2Codes
4.3Electrical Requirements
4.5Service Clearances
4.6Clearances To Combustible Surfaces
5 GENERAL PIPING GUIDELINES
5.1Inlet and Outlet Connections
SINGLE WATER PIPING
PV500-47C06/12
PV500-47C06/12
TWO WATER HEATERS WITH REVERSE RETURN PIPING
6CONDENSATE DRAIN, TRAP & DISPOSAL
PV500-47C06/12
6.1Condensate Neutralization System optional
Optional Condensate Neutralization System
SINGLE UNIT INSTALLATION SUGGESTED PIPE SIZE
7GAS SUPPLY AND PIPING
7.1Gas Train and Controls Certification
7.2Gas Control Trains
MULTIPLE UNIT INSTALLATIONS GAS PIPING SIZE CHART
Nominal Iron
Length of Pipe in Straight Feet
Inches
8COMBUSTION AND VENTILATION AIR
8.1 Equipment Located In Confined Spaces
∙All Air From Outdoors
∙All Air From Inside The Building
Remote Air Duct Specifications
Duct Fitting Equivalent Length
Duct Pipe
6” Duct
Venting Specifications
Volume cfm
9 VENTING 9.1Venting the TRICON
Maximum Category IV Vent Equivalent Length
9.3Vertical or Horizontal Vent Termination
9.4Combining Category IV Vents
Conventional Venting
Through the Wall Venting
10OPERATING AND SAFETY CONTROLS
10.1Temperature and Pressure Relief Valve s
10.2Operating Temperature Control
10.3High Water Temperature Limit Control
11 TEMPTRAC ELECTRONIC CONTROLLER PANEL
11.1Principle Of Operation
11.2Lower Led Readout
11.3Upper Led Readout
11.5To View The Setpoint
11.6To Change The Setpoint
11.7To Change Other Parameters
PV500-47C06/12
11.8LED Display Alarm Messages
ALARM
RESULTS OF ALARM CONDITION
CAUSE
13SEQUENCE OF OPERATION 1.Incoming 120VAC
PV500-47C06/12
7.Loss of Flame Signal
FAULT MODE
LED INDICATION
PV500-47C06/12
14.5Startup Procedure
14 INITIAL STARTUP
14.1Initial Startup Requirements
14.2Tools and Instrumentation Required
PV500-47C06/12
13.Turn-offmain gas shutoff valve
16.Turn-onmain gas shutoff valve
Burner Combustion Adjustment
PV500-47C06/12
Gas Train Illustration
Alternate Gas Train Illustration
PV500-47C06/12
Optional components may not be shown
15 TROUBLESHOOTING GUIDE
Problem
Probable Cause
Corrective Action
PV500-47C06/12
REPLACEMENT PARTS
16 REPLACEMENT PARTS
16.1 Control Panel
PV500-47C06/12
PV500-47C06/12
16.2Control Panel Components
Optional components may not be included
PV500-47C06/12
16.3Burner Assembly
Optional components may or may not be shown
16.4Burner Assembly Components
BURNER ASSEMBLY COMPONENTS
Optional components may not be included
Item No
PV500-47C06/12
BURNER GAS TRAIN COMPONENTS
Contact factory for more information
17PERIODIC MAINTENANCE
PV500-47C06/12
i.Cycle unit and test to verify all safety and operating controls are properly functioning and the burner top plate flange is free of leaks
PV500-47C06/12
18RECOMMENDED MAINTENANCE SCHEDULE
1.Annual Maintenance
3.Monthly Maintenance
4.Daily Maintenance
PV500-47C06/12