INSTALLATION
Procedure for Installation on Carpet (Horizontal Position)
1
•Confirm that the
•Attach the left and right brackets (A) using the hexagonal bolt (M4 x 5).
•Attach the left and right brackets (A) to their respective brackets (B) using the hexagonal bolts (M6 x 12) and the hexagonal nuts (M6).
Hexagon bolts (M6 x 12)
|
|
|
| Hexagonal |
|
|
|
| bolts |
|
|
|
| (M4 x 5) |
2 | • | Pull back the carpet and determine | 3 | • Remove the hexagonal nuts and |
|
| where to attach the unit. |
| take off the changer. |
| • | Stick the supplied |
|
|
|
| tape to the bottom of the brackets |
|
|
|
| (B) and peel off the paper backing. |
|
|
| • | Affix the unit to the floor by pressing |
|
|
|
| in place. |
|
|
4 | • Using a knife, cut “X”s in the carpet | 5 | • Once more, use the hexagonal nuts |
| directly above the brackets (B) bolts. |
| to attach the changer on top of the |
|
| ||
|
|
| carpet. |
•Return the carpet to its original
position allowing the bolts to stick through.
8