Rigging
Front Articulated Joint (Knuckle) Hardware
Expose the end of the articulated joint by locating the joint’s retaining screw protruding from the front of the receiver tube and sliding it upward. The front captive joint will slide upward from the enclosure’s receiver tube.
The exposed end of the articulated joint can now be inserted into the adjacent enclosure’s receiver tube and locked into position by a locking pin. This is repeated for each side of the enclosure. Then the rear link bar can be rotated into position and pinned at the chosen increment.
1
2
1. Front Articulated
2. Then lock in place using the
Rear Link (Angle Adjust) Hardware
The rear link is stored with the link folded between the sides of the block. To expose the link, remove the
The rear link is marked with a thin, white line at the “normal” (0°) position and with a “+3” at the +3° position.
The additional
1.Rear
2.Lock in place using the
1
2
6