Prepare the wall fixings as required.

5Set the temperature control lever to full cold (9 o’clock) prior to removing the four screws

securing the lever to the valve. Carefully remove the temperature lever to reveal the lilac temperature preset override ring and the white temperature preset location ring. Neither of these parts need to be removed for installation. However if they are removed please take a note of their orientation on the valve prior to removal (as illustrated).

6Carefully remove the shroud from the valve assembly.

7If the valve is being installed for use with a gas fired instantaneous (multipoint) water

heater or a combination boiler, the cold water flow regulator must be fitted at this stage by insertion into the cold water port as shown (the flow regulator is supplied in its own pack).

8Fit the elbows to the valve body hand tight, ensuring that the rubber washers are correctly engaged (these are supplied in the screw pack).

9The Quartz Thermo valve is supplied with an outlet cap on the bottom of the valve allowing for a top outlet connection. The bottom outlet can be used by

simply removing the cap and repositioning it on the top outlet. If the cap is removed please ensure that when replaced, the membrane in the cap is in place and that the cap is done up tight.

10

Fit the outlet connector ensuring the rubber

washer is correctly engaged (supplied in the

screwpack), on the required outlet ensuring a tight fit. Offer the valve up to the required fixing position to check the four fixings points are correct and there is adequate space available around both inlet elbows and outlet connector.

Prepare the wall fixings as required.

Quartz Thermo installation guide

 

page 6

 

 

 

Page 6
Image 6
Quartz QZ3111 manual Quartz Thermo installation guide, Prepare the wall fixings as required