RAD Data comm 100 Operation, LED Indicators, Connecting the 4-wire WAN Interface Connecting Power

Models: 100

1 9
Download 9 pages 25.47 Kb
Page 8
Image 8
OPERATION

TERMINAL BLOCK

TX

4-WIRE CABLE GND RX

 

100

 

LAN

WAN

PWR

 

 

100

 

-

 

TinyBridge

X ANFIL 100FD

ON Table 2. LED Indicators

FLC

LNGFP

ON Table 3. DB-25 Pin Allocation

OPERATION

TinyBridge-100 operation is automatic. Table 2 shows how to diagnose the status of the TinyBridge-100 from the LED indicators.

Table 2. LED Indicators

 

Table 3. DB-25 Pin Allocation

 

 

(V.24/RS-232)

 

 

 

Pin

Name

Type

 

 

 

1

SHIELD

 

2

TxD

Output

3

RxD

Input

SCREW TERMINAL

Figure 7. Connecting the 4-wire WAN

Interface

Connecting Power

1.Connect external power adapter to a mains outlet

2.Plug in the external power adapter jack to the TinyBridge-100. The PWR LED lights up

Note: While the TinyBridge-100 operates with any regulated 5 VDC, 600 mA power supply, the CE approval requires use of the power supply listed in Ordering.

LED

Color

Description

 

 

 

PWR

Green

ON – Power is connected

 

 

OFF – Power is disconnected

WAN

Yellow

ON – Activity on WAN (includes idle)

 

 

OFF – No activity on WAN

 

Red1

ON – Error condition on WAN

 

 

OFF – No error condition on WAN

LAN

Green

OFF – No link integrity

 

 

ON – Link integrity

 

Yellow

OFF – No activity on LAN

 

 

Blinking – Activity on LAN

100Green ON – 100 Mbps LAN OFF – 10 Mbps LAN

14-wire model

4

RTS

Output

5

CTS

Input

6

NC

 

7

GND

 

8

NC

 

9

NC

 

10

NC

 

11

NC

 

12

NC

 

13

NC

 

14

NC

 

15

TCLK

Input

16

NC

 

17

RCLK

Input

18

NC

 

19

NC

 

20

NC

 

21

NC

 

22

 

 

23

NC

 

24

NC

 

25

NC

 

Page 8
Image 8
RAD Data comm 100 Operation, LED Indicators, Connecting the 4-wire WAN Interface Connecting Power, DB-25 Pin Allocation