Chapter 2

Installation & Setup

Before Unpacking

Unpacking

Procedure

2.1 Unpacking

Inspect the equipment container before unpacking. Note and report evidence of damage immediately.

Place the container on a clean flat surface. Cut all straps and open or remove top.

Remove the unit carefully and place it securely on a clean surface.

Remove all packing material.

Inspect the unit for damage. Report any damage immediately.

 

2.2 Site Requirements

Power

AMC-101 is powered by 100 to 240 VAC or -48 VDC.

 

The unit should be installed within 1.5m (5 ft) of an easily accessible

 

grounded AC outlet capable of supplying 230 V (115 V).

Front and Rear

Allow at least 90 cm (36 in) of clearance at the front of the unit for operator

Panel Clearance

access. Allow at least 10 cm (4 in) clearance at the rear of the unit for power

 

cord connection.

Ambient

The ambient operating temperature of AMC-101 should be 0-40oC

Requirements

(32-122oF) at a relative humidity of up to 90%, non-condensing.

Site Requirements 2-1