BURNER DRAWER REMOVAL

LOW NOx BURNER TRAY ASSEMBLY

BURNER DRAWER REMOVAL

1.Shut off main electrical power switch to heater.

2.Shut off gas upstream of heater.

3.Remove front door.

4.Disconnect gas line from gas valve.

5.Remove (2) screws that mount burner tray to unit, and (4) screws that secure gas valve to jacket.

6.Disconnect wires that terminate at gas valve.

7.Unscrew (4) screws that secure the control box.

8.Disconnect pilot wire from the ignition module.

9.Disconnect wire harness from the combustion blower.

10.Carefully slide out the burner tray assembly.

11.Reverse above procedure to reinstall.

GAS VALVE REMOVAL

1.Shut off main electrical power switch to heater.

2.Shut off gas supply to the heater.

3.Remove front door.

4.Disconnect gas line from gas valve.

5.Disconnect wires, pilot tubing and bleed line, if required.

6.Remove (2) screws that secure gas valve to jacket.

7.Turn vertical gas pipe from manifold slightly and unscrew gas valve.

8.Reverse above procedure to re-install.

MAIN BURNER AND ORIFICE REMOVAL

1.Remove burner drawer. See burner drawer re- moval procedure.

2.Remove (8) screws from the hold down brackets.

3.Remove (8) screws from the left and right sides of the Manifold assembly. Detach the manifold as- sembly from the burner tray assembly.

4.Use a long ½” socket wrench to remove orifices from the gas manifold.

5.Remove burners by raising the bracket on the back end of the burners up and out of their slots.

6.Reverse above procedure to re-install.

.

Fig # 9363

IID PILOT

PILOT REMOVAL

1.Disconnect pilot tubing from gas valve.

2.Remove (4) screws from control box. Open the control box.

3.Remove the pilot wire from the ignition wire.

4.Remove (2) screws that mount the pilot bracket to the air manifold assembly.

5.Pull the pilot bracket downwards and outwards.

6.Reverse above procedure to re-install.

COMBUSTION FAN REMOVAL

1.Remove burner drawer. See burner drawer removal procedure.

2.Remove (4) screws the mount the combustion blower to the manifold assembly.

3.Reverse above procedure to re-install.

NORMAL INSPECTION PROCEDURES

First and third month after initial start up and then on an annual basis. If problems are found, refer to Trouble Shooting Guide for additional directions.

1.Remove top of heater and inspect heat exchanger for soot and examine venting system.

2.Remove rear header and inspect for scale depos- its.

*3. Inspect pilot and main burner flame and firing rate.

*4. Inspect and operate all controls and gas valve.

*5. Visually inspect system for water leaks.

*6. a.Oil pump motor and bearing assembly, if oil cups are provided.

b.Disconnect pump from header and check condition of pump impeller. Check condition of bearing by attempting to move impeller from side to side. Replace any parts showing wear.

c.Check pump coupler for wear and vibration.

7.Check flow switch paddle (if provided).

8.Clean room air intake openings to assure ade- quate flow of combustion and ventilation air.

CAUTION: Combustion air must not be contaminated by corrosive chemical fumes which can damage the heater and void the warranty.

9.Keep heater area clear and free from combustible materials, gasoline, and other flammable vapors and liquids.

*Should be checked monthly. (Takes approximately 15 minutes).