14.Attach the Curl Pad (22) to the Curl Post (11) with two M6 x 15mm Screws (41).
15.Insert the Inner Barbell (60) into the Outer Barbell (59) and align the holes. Using a hammer, tap the two Roll Pins (58) into the holes until they are flush with the Outer Barbell.
14
41
22
11
15
58
59
60
16.Make sure that all parts are properly tightened before the weight bench is used. The use of all remaining parts will be explained in ADJUSTMENTS starting on the next page.
9