5. With the help of a second person, carefully tip

5

 

 

the treadmill onto its right side. Partially fold the

 

 

 

 

 

Frame (55) so that the treadmill is more stable.

 

85

 

Do not fully fold the Frame until the treadmill

 

 

 

is completely assembled.

81

 

 

 

 

 

Attach two Base Pads (81) to the Base (85) with

1

 

 

two #8 x 1" Tek Screws (1).

 

 

 

 

1

81

 

 

 

 

 

 

55

6. Insert an Extension Leg (97) into the Base (85)

6

 

 

as shown. If necessary, use a rubber mallet to

 

 

 

 

 

fully insert the Extension Leg. Next, hold two

 

 

 

Extension Leg Nuts (10) in the bottom of the

 

 

 

Extension Leg, and tighten two 5/16" x 2" Bolts (2)

 

85

 

with two 5/16" Star Washers (9) into into the top

 

 

9

of the Extension Leg.

 

 

2

 

 

 

 

 

10

97

 

 

 

7. Attach the Left Upright (111) to the Base (85)

7

 

 

with a 3/8" x 1" Bolt (4), a 3/8" x 2 3/4" Bolt (5),

 

 

 

 

 

and two 3/8" Star Washers (8). Start both Bolts

 

 

 

before tightening them.

 

111

 

 

 

85

 

 

5

 

 

 

4

8

 

 

 

 

 

8

 

 

Page 8
Image 8
Reebok Fitness RBTL79607.0 manual