Manuals
/
Reliance Water Heaters
/
Household Appliance
/
Water Heater
Reliance Water Heaters
6 50YTVIT SERIES 100, 317686-000 Troubleshootinotesg Guidelines
Models:
317686-000
6 50YTVIT SERIES 100
1
38
40
40
Download
40 pages
10.09 Kb
33
34
35
36
37
38
39
40
<
>
Troubleshooting
Install
Repair Parts List
Parts list
Power Vent Wiring Schematic - Figure
Replacement Parts And Deliming Products
Warranty
Maintenance
Problem
Vent Pipe Assembly
Page 38
Image 38
TROUBLESHOOTINOTESG GUIDELINES
38
Page 37
Page 39
Page 38
Image 38
Page 37
Page 39
Contents
Instruction Manual
For Your Safety
RESIDENTIAL GAS WATER HEATERS
MODEL 6 50YTVIT SERIES
IMPORTANT DEFINITIONS
SAFE INSTALLATION, USE AND SERVICE
APPROVALS
DANGER
GENERAL SAFETY INFORMATION
GENERAL SAFETY INFORMATION
Preparing for the Installation
TABLE OF CONTENTS
Qualified Installer or Service Agency
INTRODUCTION
APPROVED CARBON MONOXIDE DETECTORS
INSTALLATION OF CARBON MONOXIDE DETECTORS
Commonwealth of Massachusetts
SIGNAGE
GET TO KNOW YOUR WATER HEATER - GAS MODELS
TYPICAL INSTALLATION
REPLACEMENT PARTS AND DELIMING PRODUCTS
PTemperature & Pressure Relief Valve
FIGURE 1A
CONDENSATE HOSE AND DRAIN PAN
TYPICAL INSTALLATION
FIGURE
DANGER
Mixing Valves
TYPICAL INSTALLATION
LOCATING THE NEW WATER HEATER
Facts to Consider About the Location
INSULATION BLANKETS
Air REQUIREMENTs
Fresh Air Openings For Confined Spaces
Unconfined Space
CONFINED SPACE
Outdoor Air Through Two Openings
AIR FROM OTHER INDOOR SPACES
OUTDOOR AIR THROUGH TWO HORIZONTAL DUCTS
OUTDOOR AIR THROUGH TWO VERTICAL DUCTS
FIGURE 9A
Water Piping
INSTALLING THE NEW WATER HEATER
CHEMICAL VAPOR CORROSION
SPACE HEATING AND POTABLE WATER SYSTEM
Thermal Expansion
Temperature-PressureRelief Valve
Explosion Hazard
T & P Valve and Pipe Insulation
Fire and Explosion Hazard
HIGH ALTITUDE INSTALLATION
Water Damage Hazard
Gas Piping
FIGURE 12. GAS PIPING WITH FLEXIBLE CONNECTOR
SEDIMENT TRAPS
Filling the Water Heater
FIGURE 13. GAS PIPING WITH ALL
VENT PIPE ASSEMBLY
VENTING
Termination Clearances Sidewall Power Vent
VENT PIPE TERMINATION
Breathing Hazard - Carbon Monoxide Gas
PLANNING THE VENT SYSTEM
CONDENSATE
If using 2” inch vent pipe
VENT TERMINAL INSTALLATION, SIDEWALL
BLOWER ASSEMBLY INSTALLATION
INSTALLATION OF VENT SYSTEM
FIGURE
VENT TERMINATION - FIGURE
SEQUENCE OF INSTALLATIONS, FIGURE
POWER VENT WIRING SCHEMATIC - FIGURE
INSTALLATION OF VENT SYSTEM, SIDEWALL
INSTALLATION OF VERTICAL VENT SYSTEM
VENT ATTENUATION ASSEMBLY KIT PARTS LIST
VENT ATTENUATION ASSEMBLY
INSTALLATION INSTRUCTIONS
VENT ATTENUATION ASSEMBLY INSTALLATION
4 inch vent Vertical VAA Installations
FIGURE 23 Typical Horizontal Installation
3 inch vent Vertical VAA Installations
3 inch vent Horizontal VAA Installations
AND CEMENT APPLICATIONS
VENT PIPE PREPARATION
RECOMMENDED BRUSH* SIZE FOR PRIMER
1.INITIAL PREPARATION
STEP F G. Cleanup and joint movement
D.Inspection, cleaning, priming
STEP E F. Joint assembly
B.Deburring
Page
Water Temperature
TEMPERATURE REGULATION
GAS CONTROL VALVE - FRONT VIEW
Time to Produce
START UP CONDITIONS
PERIODIC MAINTENANCE
FOR YOUR INFORMATION
OPERATIONAL CONDITIONS
Housekeeping
Burner Cleaning
Burner OPERATION AND Inspection
ANODE ROD INSPECTION
Burn hazard
Temperature-PressureRelief Valve Test
DRAINING AND FLUSHING
Hot water discharge
Service
LEAKAGE CHECKPOINTS
Blower Assembly
REPAIR PARTS LIST
Control Valve Assembly
Switch and Harness Assembly
PROBLEM
TROUBLESHOOTING GUIDELINES
TROUBLE SHOOTING
SOLUTION
# 7 8 9 10 11 12 13 14 15 16
PROBLEM
SOLUTION
LED STATUS
TROUBLESHOOTING GUIDELINES
TROUBLESHOOTINOTESG GUIDELINES
CLAIM PROCEDURE
LIMITED RESIDENTIAL GAS WARRANTY
SERVICE AND LABOR RESPONSIBILITY
CONDITIONS AND EXCEPTIONS