Manuals
/
Reliance Water Heaters
/
Household Appliance
/
Water Heater
Reliance Water Heaters
HE50 76N Series 100 Condensate Hose And Drain Pan, Typical Installation
Models:
317775-000
HE50 76N Series 100
1
8
40
40
Download
40 pages
122 b
5
6
7
8
9
10
11
12
<
>
Troubleshooting
Capacity and Gas and Electrical Characteristics
Install
Parts list
Power Vent Wiring Schematic - Figure
Replacement Parts And Deliming Products
Warranty
Maintenance
Problem
Vent Pipe Assembly
Page 8
Image 8
TYPICAL INSTALLATION
CONDENSATE HOSE AND DRAIN PAN
FIGURE 1 (continued).
8
Page 7
Page 9
Page 8
Image 8
Page 7
Page 9
Contents
POWER VENTED GAS MODELS W/HOT SURFACE IGNITION
For Your Safety
COMMERCIAL GAS WATER HEATERS
MODEL HE 50 76N SERIES
SAFE INSTALLATION, USE AND SERVICE
APPROVALS
IMPORTANT DEFINITIONS
DANGER
GENERAL SAFETY INFORMATION
GENERAL SAFETY INFORMATION
TABLE OF CONTENTS
Qualified Installer or Service Agency
Preparing for the Installation
INTRODUCTION
INSTALLATION OF CARBON MONOXIDE DETECTORS
Commonwealth of Massachusetts
APPROVED CARBON MONOXIDE DETECTORS
SIGNAGE
TYPICAL INSTALLATION
REPLACEMENT PARTS AND DELIMING PRODUCTS
GET TO KNOW YOUR WATER HEATER - GAS MODELS
PTemperature & Pressure Relief Valve
FIGURE 1 continued
CONDENSATE HOSE AND DRAIN PAN
TYPICAL INSTALLATION
DANGER
Mixing Valves
TYPICAL INSTALLATION
Water Temperature
Capacity and Gas and Electrical Characteristics
ROUGH-IN-DIMENSIONS
Rough-In-Dimensions
LOCATING THE NEW WATER HEATER
Facts to Consider About the Location
INSULATION BLANKETS
Air REQUIREMENTs
Unconfined Space
CONFINED SPACE
Fresh Air Openings For Confined Spaces
Outdoor Air Through Two Openings
OUTDOOR AIR THROUGH TWO HORIZONTAL DUCTS
OUTDOOR AIR THROUGH TWO VERTICAL DUCTS
AIR FROM OTHER INDOOR SPACES
FIGURE 9A
INSTALLING THE NEW WATER HEATER
CHEMICAL VAPOR CORROSION
Water Piping
SPACE HEATING AND POTABLE WATER SYSTEM
Temperature-PressureRelief Valve
Explosion Hazard
Thermal Expansion
T & P Valve and Pipe Insulation if supplied
HIGH ALTITUDE INSTALLATION
Water Damage Hazard
Fire and Explosion Hazard
Gas Piping
SEDIMENT TRAPS
Filling the Water Heater
FIGURE 12. GAS PIPING WITH FLEXIBLE CONNECTOR
FIGURE 13. GAS PIPING WITH ALL
VENT PIPE ASSEMBLY
VENTING
Termination Clearances Sidewall Power Vent
VENT PIPE TERMINATION
PLANNING THE VENT SYSTEM
CONDENSATE
Breathing Hazard - Carbon Monoxide Gas
If using 2” inch vent pipe
VENT TERMINAL INSTALLATION, SIDEWALL
BLOWER ASSEMBLY INSTALLATION
INSTALLATION OF VENT SYSTEM
POWER VENT WIRING SCHEMATIC - FIGURE
VENT TERMINATION - FIGURE
INSTALLATION OF VENT SYSTEM, SIDEWALL
INSTALLATION OF VERTICAL VENT SYSTEM
VENT ATTENUATION ASSEMBLY
INSTALLATION INSTRUCTIONS
VENT ATTENUATION ASSEMBLY KIT PARTS LIST
VENT ATTENUATION ASSEMBLY INSTALLATION
FIGURE 23 Typical Horizontal Installation
3 inch vent Vertical VAA Installations
4 inch vent Vertical VAA Installations
3 inch vent Horizontal VAA Installations
VENT PIPE PREPARATION
RECOMMENDED BRUSH* SIZE FOR PRIMER
AND CEMENT APPLICATIONS
1.INITIAL PREPARATION
D.Inspection, cleaning, priming
STEP E F. Joint assembly
STEP F G. Cleanup and joint movement
B.Deburring
FOR YOUR SAFETY READ BEFORE OPERATING
POWER BEFORE SERVICING
OPERATING INSTRUCTIONS
TO TURN OFF GAS TO APPLIANCE
TEMPERATURE REGULATION
TEMPERATURE INDICATORS
TEMPERATURE ADJUSTMENT BUTTONS
Display
FOR YOUR INFORMATION
START UP CONDITIONS
OPERATIONAL CONDITIONS
HIGH WATER TEMPERATURE SHUT OFF SYSTEM
PERIODIC MAINTENANCE
Burner Cleaning
Venting System Inspection
Burner OPERATION AND Inspection
Temperature-PressureRelief Valve Test
DANGER
DANGER
Explosion Hazard
Service
LEAKAGE CHECKPOINTS
TROUBLESHOOTING GUIDELINES
TROUBLE SHOOTING
PROBLEM
SOLUTION
TROUBLESHOOTING GUIDELINES
TROUBLE SHOOTING
PROBLEM
SOLUTION
TROUBLESHOOTING GUIDELINES
TROUBLE SHOOTING
PROBLEM
SOLUTION
TROUBLESHOOTING GUIDELINES
Limited Warranty
reliance Water Heaters