RJTech 7H, 10H manual Parts List RJ No, Inspection, Locking Link Assembly Removal

Models: 10H 7H

1 34
Download 34 pages 50.8 Kb
Page 22
Image 22

 

 

Section 11 Page 3 of 3

11.7

Parts List

 

 

 

RJ No

Locking Link Assembly 17" complete with fasteners

SP207

Locking Link Assembly 15" complete with fasteners

SP208

M6 X 25 hex head set screw, zinc plated

 

F125

M6 self-locking thin nut, zinc plated

 

F130

1/4 Diameter Nylon plain washer

 

F86

11.8

Inspection

 

Check Locking Link for security of thumb catch and correct operation. The Locking Link should open/close easily and the thumb catch must hold securely in the open position so that the wheelchair will not fold under load.

Check each tab on the side frames for evidence of bending, elongation or worn holes, and cracks in brazing or tubing.

11.9 Locking Link Assembly Removal

Remove the M6 x 25 Screw securing the Locking Link Assembly to each sideframe.

11.10 Locking Link Assembly Fitting

Fit two 1/4 UNF High Tensile Cap Screws to secure the Locking Link Assembly to each sideframe. Tighten until the Locking Link is just securely held, then loosen the nut half a turn.

The Locking Link Assembly must be free to move without binding, but show no signs of excessive free play. Lubricate with light oil, eg 3 in 1. Overtightening of Locking Link screws will prevent pivotting action and will lead to fracture of tab to side frame.

Page 22
Image 22
RJTech 7H, 10H manual Parts List RJ No, Inspection, Locking Link Assembly Removal, Locking Link Assembly Fitting