6.FILM LOADING & THREADING

<Thermal Film Loading & Threading >

Loading Film

1.Remove the upper and lower film shafts from the machine and load the films (do not tighten the core screws at this time)

2.To load the top film, insert 1" core as shown on Figure 1 (Note the direction of the film wound)

Figure 1

3. Insert the shaft as shown in Figure 2.

Figure 2

4. Insert the core plug on the left hand side. Figure 3

Figure 3

5.Align and center the film and tighten the two core screws. Figure 4

Figure 4

6.Repeat steps 2 through 4 to load the lower film. (Please note the direction of the

film wound for the bottom roll). Figure 5

7.Load the upper and lower film shafts on the machine.

Figure 5

6

RSH-380

< Film Threading >

1.Turn the power switch on (“I” position). (The Power switch is located on the rear the unit)

2. Complete the steps in the "Loading Film" section.

Figure 1

3.Set the desired temperature.

4.Remove the Front Feed Table.

5.Pull down the upper film over the Safety Shield to the lower film; align and center the lower film to the upper film and tighten the 2 lower bolt core

screws. (Figure 1)

Figure 2

6.Rewind the upper film until it aligns with the safety cover.

7.Thread the film over the Lower Idle Bar and underneath the safety shield until the film rests on the upper roller. Figure 2

8.Put the Front Feed Table back on and close the Safety

Shield. Figure 3

Figure 3

9.Press the Run button and thread the film using the Laminating Threading Card. Figure 4

Figure 4

7

Page 4
Image 4
Royal Sovereign RSH-380 owner manual Thermal Film Loading & Threading