COMPLETING THE INSTALLATION
Checking and Testing Operations
To complete the installation, perform the following checks and tests to ensure that the air conditioner is operating correctly.
1Review all the following elements in the installation:
◆Installation site strength
◆Piping connection tightness to detect any gas leakages
◆Connection wiring
◆
◆Drainage
◆Earthing wire connection
◆Correct operations (follow the steps below)
◆Room select switch in the indoor unit
ROOM NO | Room select switch | ||
1(#19) | 2(#20) | ||
| |||
|
|
| |
A unit | L | L | |
|
|
| |
A unit | L | H | |
B unit | H | H | |
|
|
| |
C unit | H | L | |
|
|
|
2Apply the power to the outdoor unit.
-Check the fuse (250V~, 5A) : The fuse is open when the power line (L1, L2) is short.
ENGLISH
INDOOR UNIT
Room select switch(A, B, C unit)