Checking and Testing Operations

COMPLETING THE INSTALLATION

Checking and Testing Operations

To complete the installation, perform the following checks and tests to ensure that the air conditioner is operating correctly.

1Review all the following elements in the installation:

Installation site strength

Piping connection tightness to detect any gas leakages

Connection wiring

Heat-resistant insulation of the piping

Drainage

Earthing wire connection

Correct operations (follow the steps below)

Room select switch in the indoor unit

ROOM NO

Room select switch

1(#19)

2(#20)

 

 

 

 

A unit

L

L

 

 

 

A unit

L

H

B unit

H

H

 

 

 

C unit

H

L

 

 

 

2Apply the power to the outdoor unit.

-Check the fuse (250V~, 5A) : The fuse is open when the power line (L1, L2) is short.