Before Installation

PLASTIC ANCHOR

2 ea. for ceiling installation

E

ASSY SCREW TAPPING

2 ea. for ceiling installation (TH M4 X L30 BLK + 0 RING)

L WRENCH

1ea. for COVER DOME removal

TEMPLET

1ea. An installation GUIDE for installing on a ceiliing (ART PAPER)

CABLE 20M

1ea. Connecting the power and signal.

Precautions for Installation and Use

Please check whether the installation site can sufficiently support the weight of the SOC-920(P) before installation.

E

Make sure that the cable is not caught on anything or its insulation sheath is not removed. (Neglecting to do so may cause fire or damage to the product.)

Prevent people from approaching the installation area, where objects might fall during installation. Move valuables to a safe location before installation.

Install in a cool place and away from direct sunlight.

Be sure not expose the SOC-920(P) to direct sunlight even during use or storage. Use the BLC function when operating the SOC-920(P) underneath a spot light or under very bright lights.

The SOC-920(P) must be used in an area where temperature and humidity are kept within the limits specified below:

-Temperature: -10°C ~ +50°C (14°F~122°F)

-Humidity: Below 90%

SOC-920(P) - Installation Examples

It can be directly installed on ceilings.

It can be directly installed on walls.

10

11

Page 6
Image 6
Samsung SOC-920P/W manual Precautions for Installation and Use, SOC-920P Installation Examples