Sanyo MPR-411FR instruction manual Start-Upof Unit, Installation, Before Commencing Operation

Models: MPR-411FR MPR-411F

1 24
Download 24 pages 6.34 Kb
Page 12
Image 12
Installation

BEFORE COMMENCING OPERATION

Installation

1.Remove the packaging materials and tapes Remove all transportation packaging materials and tapes. Open the doors and ventilate the unit. If the outside panels are dirty, clean them with a neutral detergent and wipe it up with a wet cloth.

2.Adjust the leveling foot

Extend the leveling feet by rotating them counterclockwise to contact them to the floor.

Ensure the unit is level.

3. Fix the unit

Two fixtures are attached to the rear of the frame. Fix the frame to the wall with these fixtures and rope or chain.

4. Ground (earth)

Leveling feet

Hook

START-UP OF UNITWARNING

Use a power supply outlet with ground (earth) to prevent electric shock. If the power supply outlet is not grounded, it is necessary to install a ground by qualified engineers.

Never ground the unit through a gas pipe, water main, telephone line or lightning rod. Such

grounding may cause electric shock in the case of an incomplete circuit.

START-UP OF UNIT

The following procedures should be adhered to for initial start-up and continuous operation.

1.Connect unit to dedicated power supply. Do not put any product in the unit at this time.

2.On start-up, the alarm buzzer sometimes operates. In this case, stop the buzzer by pressing the alarm buzzer stop key (BZ).

3.Set the desired temperature.

4.Confirm that the chamber temperature is at the desired temperature.

5.When you are satisfied that the unit is working correctly, begin slowly placing product into the chamber to minimize the temperature rise.

11

Page 12
Image 12
Sanyo MPR-411FR instruction manual Start-Upof Unit, Installation, Before Commencing Operation