6.Install the blower mounting bracket to the deck using 1/2-13 x 1-1/2" hex head bolts (p/n 04001- 71), 1/2" spring lockwashers (p/n 04030-06), and 1/2-13 elastic stop nuts (p/n 04021-07). See Figure 4-3, Page 7. Do not fully tighten the hardware at this time.

7.Install the catch plate (p/n 423297) to the blower assembly using 3/8-16 x 1-1/4" carriage bolts (p/n 04003-11) facing upward. See Figure 4-4, Page 7. Secure with 3/8" spring lockwashers (p/n 04030-04) and 3/8-16 elastic stop nuts (p/n 04021-09). Do not fully tighten the hardware.

8.Install the blower assembly to the mounting bracket and secure with the mounting pin. See Figure 4-4, Page 7.

9.Align the blower assembly with the discharge opening of the cutter deck. Tighten the hardware for the mounting bracket. Then tighten the hardware for the catch plate.

10.Install the belt to the spindle pulley. When replacing the belt, see figure below.

13.Install the hopper hood assembly onto the catcher frame assembly and secure with 3/8-16 x 2-1/4" hex head bolts (p/n 04001-46) and 3/8-16 elastic stop nuts (p/n 04021-09) See Figure 5-6, Page 13.

14.Install the catcher support bracket onto the rear of the machine and secure with 5/16-18 x 1" carriage bolts (p/n 04003-04) and 5/16-18 serrated flange nuts (p/n 04019-03).

See Figure 4-5.

Catcher Support Bracket

BACK SIDE

IDLER PULLEY BLOWER PULLEY

FIGURE 4-5

FRONT SIDE

SPINDLE

PULLEY

IDLER PULLEY

 

11.Install the new belt covers and secure with the plastic wing nuts. See Page 18 of the Illustrated Parts List for proper installation.

12.Install the hopper mounting brackets

(p/n 451512) to the outside of the frame on the rear of the machine using 3/8-16 x 1" hex head bolts (p/n 04001-19) and 3/8-16 elastic stop nuts (p/n 04021-09). See Figure 5-6, Page 13.

15.Install the heat shield to the hopper hood assembly and catcher frame assembly. Secure using the hardware specified in Figure 5-6, Page 13.

16.Install the catcher frame assembly onto the rear of the machine and secure with the quick pins (p/n 04066-03) See Figure 5-6, Page 13.

17.Install adapter (p/n 461419) to the blower assembly and secure with the strap.

8

Page 10
Image 10
Scag Power Equipment GC-STT manual Back Side Idler Pulley Blower Pulley Front Side Spindle