6.Install the blower mounting bracket to the deck using 1/2-13 x 1-1/2" hex head bolts (p/n 04001- 71), 1/2" spring lockwashers (p/n 04030-06), and 1/2-13 elastic stop nuts (p/n 04021-07). See Figure 3-3, Page 3. Do not fully tighten the hardware at this time.

7.Block the right front side on the cutter deck and remove the hang chain. Install the deck lift link. Secure using hex head bolts (p/n 04001-32, 04001-20), flatwashers (p/n 04041-07), spacers (p/n 43212), and serrated flange nuts (p/n 04019- 04). See Figure 3-3.

8.Install the new belt cover from the cutter deck to the blower mounting bracket and secure with one of the original belt cover plastic wing nuts.

9.Install the catch plate (p/n 423297) to the blower assembly using 3/8-16 x 1-1/4" carriage bolts (p/n 04003-11) facing upward. Secure with 3/8" spring lockwashers (p/n 04030-04) and 3/8-16 elastic stop nuts (p/n 04021-09). Do not fully tighten the hardware at this time.

10.Install the blower assembly to the mounting bracket and secure with the mounting pin. See Figure 3-4, Page 3.

11.Align the blower assembly with the discharge opening of the cutter deck. Tighten the hardware for the mounting bracket. Then tighten the hardware for the catch plate.

12.Install the belt to the spindle pulley. When replacing the belt, see figure below.

BACK SIDE

IDLER PULLEY BLOWER

PULLEY

FRONT SIDE

SPINDLE

PULLEY

IDLER PULLEY

 

13.Install the plastic belt cover and secure with the plastic wing nuts. See Page 18 of the Illustrated Parts List for proper installation.

14.Install the hopper mounting brackets (p/n 451512) to the outside of the frame on the rear of the machine using 3/8-16 x 1" hex head bolts

(p/n 04001-19) and 3/8-16 elastic stop nuts (p/n 04021-09). See Figure 5-6, Page 13.

15.Install the hopper hood assembly onto the catcher frame assembly and secure with 3/8-16 x 2-1/4" hex head bolts (p/n 04001-46) and 3/8-16 elastic stop nuts (p/n 04021-09) in the mounting holes. See Figure 5-6, Page 13.

16.Install the catcher support bracket onto the rear of the machine and secure with 5/16-18 x 1" carriage bolts (p/n 04003-04) and 5/16-18 serrated flange nuts (p/n 04019-03) See Figure 3-5.

Catcher Support Bracket

FIGURE 3-5

17.Install the heat shield to the hopper hood assembly and catcher frame assembly. Secure using the hardware specified in Figure 5-6, Page 13.

18.Install adapter (p/n 461419) to the blower

assembly and secure with the strap.

4

Page 6
Image 6
Scag Power Equipment GC-STT manual Back Side Idler Pulley Blower Front Side Spindle