CU1526, CU2026, CU3030

CU1526, CU2026, CU3030

User Manual

Adjustments

Bridge Thickness - For the Service Tech Only

1.Remove left louver, locate controller on and off switches.

2.Push and hold Off till the machine stops.

3.Remove curtain.

4.Use a hex wrench and rotate the bridge thickness adjustment screw in 1/8 turn increments CW to increase bridge thickness. Rotate CCW to decrease bridge thickness.

Caution: Do not make the bridge too thin or the machine will not harvest properly. Bridge thickness adjustments are not covered by warranty.

5.Return curtain and louver to their normal positions.

6.Push and release the On button. Check next harvest of ice. Repeat steps 1-6 if needed.

Water Purge Setting

The water purge is factory set to the automatic position, suitable for most water conditions. The setting can be changed to one of 5 manual settings or left on automatic.

Setting

Water Type

1

Minimum - RO water or equivalent

2

Moderate - Low TDS, non RO

3

Standard - for typical water

4

Heavy - High TDS

5

Maximum - Very high TDS

A

Automatic - Factory setting

Note: Water cooled models, the refrigeration system discharge pressure is factory set at 245 PSIG, which should yield a freeze cycle discharge water temperature of about 105-110 degrees F. Adjust if necessary.

1/8-3/16"

bridge

Too Big

Just Right

Too Small

Ice Bridge Thickness Measurement

Adjustment

Screw

Bridge Thickness Adjustment Mechanism

To set purge:

1.Switch the machine OFF by holding the Off button in until a number or the letter A shows on the display.

2.Press and release the On button repeatedly until the number on the display corresponds to the desired setting.

3.Press and release the Off switch again to return to the normal control state.

May 2008

Page 11

Page 12
Image 12
Scotsman Ice CU1526, CU2026 user manual Too Big, Just Right, Too Small