Removal and Repair
Cube Size Thermostat
1. Disconnect unit from electrical power.
2. Remove door.
3. Remove top panel.
4. Remove service panel.
5. Remove back panel.
6. Cut cable tie holding cube size bulb in
evaporator well. Pull bulb out of well.
7. Pull cube size cap tube and bulb from
evaporator area and allow to hang freely behind
machine.
8. Remove two screws holding thermostat bracket
to cabinet. Drop bracket down and pull forward to
get access to wires and screws.
9. Disconnect wires from cube size thermostat.
10. Remove two screws holding cube size
thermostat to bracket. Pull cube size thermostat
from the machine.
11. Route new cube size thermostat bulb and cap
tube from the front, through the hole in the air baffle
and into the back of the unit.
12. Attach cube size thermostat to thermostat
bracket, attach wires.
Note: Replacement thermostat wiring may be
different from the original. Check for instructions.
13. Attach bracket to cabinet.
14. Route cube size cap tube and bulb up the back
of the machine and into the evaporator area.
15. Insert bulb into evaporator well. Secure with tie
wrap.
16. Return all panels to their normal positions ans
secure with the original screws.
17. Reconnect power. Test machine, adjust cube
size as needed.
Harvest Timer
1. Disconnect electrical power.
2. Remove service panel.
3. Remove screw in center of timer, pull out and
disconnect wires.
4. Reverse to reassemble.
September 2009
Page 26
SCCG30 & SCCP30
Service Manual
Electrical Shock
Hazard.
Disconnect electrical
power before
beginning removal
Electrical Shock
Hazard.
Disconnect electrical
power before
beginning removal
Bulb Well