SCCG30 & SCCP30
Service Manual
Refrigeration Service
This ice machine use
To check for system pressures, add a field supplied
Use a low flow of dry nitrogen when brazing on the system.
Install a new filter drier when replacing a refrigeration component or after a refrigerant leak repair.
Evacuate the system to at least 300 microns and use a micron gauge to measure the evacuation level.
Weigh in the nameplate charge. The machine is critically charged and a partial ounce
September 2009
Page 29