Sea Frost DC 5000 RFD Receiver Filter Drier, Mounting The Rfd, Insulating The Lines

Models: DC 5000

1 46
Download 46 pages 60.05 Kb
Page 18
Image 18
RFD (Receiver Filter Drier)

RFD (Receiver Filter Drier)

DO NOT OPEN THE RFD UNTIL ALL THE OTHER CONNECTIONS HAVE BEEN MADE AND YOU ARE READY TO COMMISSION THE SYSTEM. Because the RFD contains desiccant to absorb moisture and the absorption is limited, it is important to unpack and install it after all other connections are made. Leaving the RFD installed on a partially open system may reduce its capacity by allowing it to absorb moisture in free air before the system is sealed.

The RFD is a reservoir for excess refrigerant. The RFD also contains a sight glass in the top. (Please refer to the planning section regarding location and "readability" of the sight glass) A pick-up tube extends from the bottom of the canister to the outlet. For proper function of the reservoir, the RFD must be VERTICAL to ensure proper operation at various heel angles.

MOUNTING THE RFD

The inlet is from the DC 5000. (The sight glass is offset on the RFD toward the outlet.) The RFD is to be mounted with the bracket and mounting strap. Cable ties with screw mounts should be used to support the tubing.

INSULATING THE LINES

Insulating should be the last step after leak testing because it will cover fittings that must be leak-checked. On long uninterrupted lengths of tubing, the insulation can be slipped over the tube early. Insulation should be installed only on dry lines, and only after the acrylic spray is applied to all metal parts. The suction return line is cold and will attract moisture (as frost) when running. The suction return line includes all the exposed 1/2" tubing and the larger fittings. The entire V/U will also frost. It is important to insulate the 1/2" line, the V/U and all the fittings along the line to prevent moisture from gathering.

INSTALL THE INSULATION IN A MANNER THAT WILL NOT TRAP WATER AROUND A LOW POINT. Trapping salty bilge water in the insulation will reduce the operating life of tubing and fittings. If the insulation is split and wrapped over the tube, install it with the split side down. Tubing within the icebox need not be insulated.

18

Page 18
Image 18
Sea Frost DC 5000 installation instructions RFD Receiver Filter Drier, Mounting The Rfd, Insulating The Lines