Manuals
/
Sea Frost
/
Kitchen Appliance
/
Refrigerator
Sea Frost
DC 5000 installation instructions
Models:
DC 5000
1
45
46
46
Download
46 pages
60.05 Kb
39
40
41
42
43
44
45
46
<
>
Troubleshooting
Install
Pressure Charts
Maintenance
Wire Sizes
Assembly Inspection Check List
Commissioning Procedure
Cleaning
Page 45
Image 45
45
Page 44
Page 46
Page 45
Image 45
Page 44
Page 46
Contents
DC 5000 SYSTEM 134a
START UP PROCEDURE AND PERIODIC INSPECTION
compressor at once
RFD SIGHT GLASS DETAIL
TABLE OF CONTENTS
GENERAL DESCRIPTION
BREAK-INPERIOD
OPERATION
SUGGESTIONS
ICE MAKING
MAINTENANCE
HARVESTING VERTICAL TRAYS
STORAGE OF ICE CUBES
HOW REFRIGERATION WORKS
CLEANING
TUBE HANDLING
INSTALLATION ~ WORK HABITS
TUBE CUTTING
INSTALLING THE DC 5000 COMPRESSOR UNIT
TUBE BENDING
FIT RFD LAST
The pump will not self-prime
WATER PUMP INSTALLATION AND WATER CIRCUIT
The pump motor must be above the pump body
The pump outlet must be above the pump inlet
PLATE LOCATION
ABOUT THE PUMP
NOTES ON SWAGELOK FITTINGS
VALVE UNIT V/U
DRAWING
RECONNECTING PRE-SWAGEDFITTINGS
RUNNING THE LINES
SWAGELOK PERFORMANCE
POSITIONING THE RFD
PLANNING
HELPFUL TOOLS
LINE CONNECTION PLAN
RFD Receiver Filter Drier
MOUNTING THE RFD
INSULATING THE LINES
CABLE TIES
to leave a sharp end on the cable tie
ELECTRICAL SYSTEM
ELECTRICAL JUNCTION BOX
THERMOSTAT CONTROL PANEL LOCATION
WIRE SIZES
GROUND WIRE
WIRING
ASSEMBLY INSPECTION CHECK LIST
FUSES
GENERAL SAFETY THIS IS IMPORTANT. READ THIS
REFRIGERANT HANDLING AND SAFETY
DISCLAIMER
REFRIGERANT
ACCESS TO THE SYSTEM SERVICE ACCESS PORTS
PROCEDURES FOR WORKING WITH R-134a
GAUGES
R-134aSERVICE CONNECTING VALVES
DISCONNECTING GAUGES
CONNECTING GAUGES
TAPPING A CAN OF REFRIGERANT
VENTING THE GAUGE SET
VENTING THE CHARGE HOSE
LIQUID OR VAPOR
EVACUATION WITH A VACUUM PUMP
COMMISSIONING PROCEDURE
EVACUATION LEAK TEST
NEW SYSTEM CHARGING INTRODUCING INITIAL CHARGE
TO LEAK CHECK WITH BUBBLES
LEAK CHECKING A CHARGED SYSTEM ABOUT PRESSURES
TO LEAK CHECK WITH AN ELECTRONIC DETECTOR
IF A LEAK IS DETECTED
NEW SYSTEM CHARGING
READING THE SIGHT GLASS
PROPER CHARGE AMOUNT
RFD SIGHT GLASS DETAIL
GENERAL INFORMATION
SPECIAL NOTE
TROUBLESHOOTING
DISCHARGING THE SYSTEM
corrected
bIf the pressure readings are over 50 psi with the compressor off, proceed to check charge level via sight glass and charge if needed. Charge loss indicates a leak that must be corrected
Technical help
Recharge. Refer to New System Charging
TOLL FREE IN THE UNITED STATES
CANADA, AND CARIBBEAN
PRESSURE CHARTS
PRESSURE CHARTS
PRESSURE CHARTS
DC 5000 MOTOR AND WATER PUMP MAINTENANCE
Lubrication
Brushes Leeson Motor
March Water Pump
DC5000 WIRING
DC 5000 LAYOUT
DC 5000 WATER CIRCUIT
TWIN VALVE SYSTEMS ONLY
Page
DC 5000 Low Voltage Protection Relay