TO REMOVE DOZER BLADE FROM TRACTOR
1.Lower blade to ground with blade in the center (straight) position.
2.Refer to figure 32 below and;
A.Remove 1/8" hairpin cotter from the lift arm link and channel assembly.
B.Remove 3/32 (smaU) hairpin cotters and 7/16" flat washers from each lift assembly arm.
C.Remove 3/32" (small) hairpin cotters from right and left hand lift pivot plates, remove two 3/8" clevis pins from each side of frame, unhook and lower the lift assembly to the ground.
13.Remove lift rod truenions and hex nuts from each lift link rod. See Figure 32 and figure 16 on page 7.
__._. NOTE
Frame Brackets do not require re- moval for
See figure | 32. |
LIFT PIVOT | LIFT ASSEMBLY |
PLATE | CLEVIS PINS |
| ARM |
| LINK |
LIFT ROD TRUNNION,
HAIRPIN AND 318"HEX NUTS HAIRPIN
(R.H:)HITCHPLATE
"IAIRF
KEEPER
PLATE
GUIDE
BRACKET
ASSEMBLY
FIGURE 33
H. Refer to figure 34 and remove hairpin cotter from end of handle guide to release handle assembly from tractor.
Save all loose parts and hardware for re- assembly of blade to tractor.
•HAIRPIN
COTTER
HANDLE
ASSEMBLY
HANDLE
SUPPORTGUIDE
BRACKET
COTTERS
COTTER
FIGURE 34
FIGURE 32
E.
and level mowing deck. Mowina deck must
be leveled.
F.Refer to figure 3 and remove 1/8"
(large) hairpin cotters from ends of guide bracket assembty and remove guide bracket assembly.
G.Refer to figure 33 and remove hairpin cotters from end of channel assembly pivot shaft and remove keeper plates. Lift the chan nel assembly pivot shaft out of the hitch plates and tower charmer assembly to the ground.
12