ASSEMBLY INSTRUCTIONS
TOOLS REQUIRED FOR ASSEMBLY
1)7/1 6" Open End or Box Wrench _1) 1/2" Open End or Box Wrench
(1)9/16" Open End or Box Wrench
3/8" | X | HEX NUT | I | ||
CARRIAGE BOLT | |||||
| 3_"LOCK | ||||
(TOP | HOLE |
| |||
|
|
| WASHER |
|
(1)3/4" Open End or Box Wrench
(1)Adjustable Wrench
(1)Hammer
Refer to carton contents figure on page 2 and figure 1 on page 3 for parts and hardware needed to assemble dozer blade.
RIGHT HAND (R.H.) AND LEFT HAND
(L.H.) ARE DETERMINED FROM
OPERATOR'S POSITION WHILE
ANGLE
SLOT
SPRING PIN
HOLE
CHANNEUPIVOT
FRONT
ANGLE LOCK
SEATED ON TRACTOR.
PLATE ASSEMBLY
FIGURE 3
SPRING
1.Assemble curved end of angle lock spring into small hole in washer as shown in figure 2.
T
I
IANGLE LOCK SPRING .
3.Assemble the offset end of angle lock spring into small holes in angle lock bars as shown in figure
3.Slide lock bars through lock bar slot until spring pin hole is aligned with bracket on back side. See figure 4. Using a hammer drive 1/4 =x 1=spring pin into lock bars until flush with bracket. See figure
4.Tighten nut in angle lock bars which was left loose in step 2.
LO
. POSITION \ \ \
F G--ffffiT
2.Assemble the two angle lock bars together as shown in figure 3, using one 3/8" x
washer and a 3/8" hex nut underneath. Do not tighten at this time.
|
| \ |
SPRING PIN | _ | '_ |
FIGURE 4
rs_ | NOTE |
Lock ba | pivot freely and when |
pulled all the way back the channel/pivot plate assembly should be unlocked and free to pivot to right or left position notches.
4