Servis-Rhino 60C manual Operation, Side Slope Excavating Or Trenching

Models: 60C

1 50
Download 50 pages 59.05 Kb
Page 33
Image 33
SIDE SLOPE EXCAVATING OR TRENCHING

OPERATION

Position the unit so the backhoe swing post is over

Level the backhoe on slopes with the stabilizers to dig

the center line of the trench connection. Dig with the

plumb trenches, or use the backhoe or loader to cut a level

backhoe at extreme swing positions, and in as close

slot for the uphill wheel and stabilizer. Pile the slot on the

to the stabilizers as possible. Pile the soil on the

low side.

opposite side of the trenches.

 

 

When on the side of a steep slope, cut a level surface

 

along the uphill side of the trench with the loader.

Position the unit forward with the lift and crowd levers so

Pile the spoil of the cut downhill. When digging, pile the

the two trenches can be connected. Pile the spoil on the

spoil of the trench uphill.

opposite side of the trench.

 

Dig field trenches progressively. As soon as one trench is completed, have the work men lay the tile. Start the next trench, using the spoil to fill the previous trench.

SIDE SLOPE EXCAVATING OR TRENCHING

Dig with the backhoe uphill whenever possible.

F-4139 01/11

Operation Section 3-5

© 2011 Alamo Group Inc.

OPERATION

Page 33
Image 33
Servis-Rhino 60C manual Operation, Side Slope Excavating Or Trenching