![](/images/new-backgrounds/1113549/11354929x1.webp)
DRAG STAKE
Tilling depth is controlled by the height of the drag stake.
To adjust tilling depth.
1.Remove detent pin.
2.Raise the drag stake to position tines at chosen tilling depth.
3.Align hole in drag stake with hole in depth regulator bracket and replace detent pin.
drag stake
depth regulator bracket
Drag Stake Down = Shallower tilling. Place the detent pin in the top hole of the drag stake for shallowest tilling.
Drag Stake Up = Deeper tilling. Place the detent pin in the bottom hole of the drag stake for deepest tilling.
CAUTION
Always set the drag stake in the transport position before starting engine, that is, place the detent pin in the highest hole of the drag stake.
CAUTION
Do not adjust tilling depth unless drive control levers are released to neutral position.
Adjustments
BELT TENSION ADJUSTMENT
Proper belt tension is critical to good performance. After 1/2 hour of operation, all cables may have to be adjusted due to initial stretch. Thereafter, check tension after every 2 hours of operation.
To increase belt tension:
1.Loosen upper jam nut. Turn nut up cable in 1/8" increments.
reverse cable |
|
|
|
|
| cable | ➜ |
bracket |
|
| |
| up | forward | |
|
| ||
|
| cable | |
|
|
| |
|
|
| upper jam nut |
|
|
| lower jam nut |
2.Tighten lower jam nut.
3.Check adjustment.
This procedure can be repeated until conduit adjustment bolts have no more adjustment left. If no more adjustment can be made, belt may have to be replaced.
NOTE: Model 514RT has a forward cable only.
Page 11