EQUIPMENT CHECKLIST

Equipment Checklist

After unpacking the TigerSwitch 10/100/1000, check the contents to be sure you have received all the components. Then, before beginning the installation, be sure you have all other necessary installation equipment.

Package Contents

TigerSwitch 10/100/1000 unit (SMC8624T or SMC8648T)

Four adhesive foot pads

Bracket Mounting Kit containing two brackets and eight screws for attaching the brackets to the switch

Power cord—either US, Continental Europe or UK

RS-232 console cable

This Installation Guide

Management Guide

SMC Warranty Registration Card—be sure to complete and return to

SMC

Optional Rack-Mounting Equipment

If you plan to rack-mount the switch, be sure to have the following equipment available:

Four mounting screws for each device you plan to install in a rack—these are not included

A screwdriver (Phillips or flathead, depending on the type of screws used)

3-3

Page 39
Image 39
SMC Networks SMC8624T manual Equipment Checklist, Package Contents, Optional Rack-Mounting Equipment