-Make sure that a separate grounded power outlet that provides 100 to 240 VAC,
Equipment Checklist
After unpacking the RPU, check the contents to be sure you have received all the components. Then, before beginning the installation, be sure you have all other necessary installation equipment.
Package Contents
•Redundant Power Unit (SMCRPU14)
•One AC Supply Power Cord — US, Continental Europe or UK
•Four DC Backup Power Cords with IEC connectors on both ends (length 152 cm/59.84 inches each)
•Rack Mounting Kit containing brackets and screws
•Adhesive feet
•Registration Card
Optional Rack-Mounting Equipment
If you plan to
•Four mounting screws for each device you plan to install in a
•A screwdriver (Phillips or flathead, depending on the type of screws used)