Initial Setup & Installation
Install the Tiller
1.Position the tiller at the rear hitch and insert the lift bar (A, Figure 13) into the upper hitch (B). Secure with a clevis pin and safety clip.
2.Rotate the tiller upward so that the hitch arms (C) are aligned with the lower hitch (D). Secure with two clevis pins and safety clips.
B |
A |
Setup & Installation |
D |
C |
Figure 13. Tiller Installation
A.Lift Bar
B.Upper Hitch
C.Hitch Arm
D.Lower Hitch
| E |
| D |
| F |
| F |
| A. PTO Pulley |
| B. Front Pulley Assembly |
B | C. Rear Pulley Assembly |
D. Tiller Idler Pulley | |
| E. Tiller Input Pulley |
A | F. Rear Idler Pulley |
Figure 14. Belt Routing
Install the Belt
1.Remove the spring clip and pin securing the tiller belt cover. Pivot the belt cover out of the way to allow access to the tiller pulleys.
2.Install the belt on the rear pulley assembly (C, Figure 14) and tiller input pulley (E). The smaller upper and lower pulleys of the rear pulley assembly (C) should trap the belt in the middle pulley groove with the belt routed below the rear idler pulley (F) as shown.
3.Install the belt on the front pulley assembly (B) and PTO pulley (A). Adjust the front pulley assembly belt guides within 1/16” of the belt.
4.Route the belt inside the
5.Reposition tiller belt cover and secure with the clevis pin and spring clip.
Adjustments
Perform the adjustments found in the “Toubleshoot- ing, Adjustments,
13