Southbend SB-5-ES, SB-10-ES manual PAGE 9 OF

Models: SB-5-ES SB-10-ES

1 24
Download 24 pages 7.81 Kb
Page 9
Image 9
PAGE 9 OF 24

OVEN / SMOKER

INITIAL START-UP

IMPORTANT: Please install any required drainage plumbing at this time. Any required drain line must be properly installed before attempting an INITIAL START–UP and Operational Check.

* * * NOTICE * * *

NATIONAL SANITATION FOUNDATION GUIDELINES REQUIRE THAT ALL INTERIOR PARTS BE REMOVABLE WITHOUT THE USE OF TOOLS. THIS EQUIPMENT HAS BEEN FACTORY ASSEMBLED TO SAFELY ACCOMMODATE ROUGH HANDLING THROUGH SHIPMENT AND ORIGINAL INSTALLATION. AFTER ANY MAINTENANCE, CLEANING OR REQUIRED SERVICE WORK THE INTERIOR SHEET–METAL PARTS SHOULD BE REASSEMBLED AND FASTENED HAND–TIGHT ONLY, BUT STILL REMAIN TIGHT ENOUGH TO PREVENT ANY RATTLE OR MOVEMENT OF PARTS.

IMPORTANT: THIS UNIT NEEDS TO BE INSTALLED WITH ADEQUATE BACKFLOW PROTECTION TO COMPLY WITH APPLICABLE FEDERAL, STATE AND LOCAL CODES.

IMPORTANT: THIS UNIT REQUIRES A SCREEN OF AT LEAST 100 MESH TO BE INSTALLED IMMEDIATELY UPSTREAM OF ALL CHECK VALVE TYPE BACKFLOW PREVENTERS USED FOR WATER SUPPLY PROTECTION. THE SCREEN SHALL BE ACCESSIBLE AND REMOVABLE FOR CLEANING OR REPLACEMENT.

INSTALLATION & OPERATIONS MANUAL 1189200 REV 0 (12/06)

PAGE 9 OF 24

Page 9
Image 9
Southbend SB-5-ES, SB-10-ES manual PAGE 9 OF