5. Remove packaging materials from handle assemblies (17 and 3).
17
3
Remove screws on both sides of tube.
6. Slide upper tube (17) onto handle assembly (3). Reinsert screws removed in previous step as shown.
NOTE:
Rotate upper tube to line up screw holes. Reinsert screws removed in previous step as shown.
Screws removed in step 6
17
3
ID# M682001 | 12/06 | 18 |