3.

 

Fill hole with concrete. Tamp down concrete to release air pockets

 

and build drainage hill.

DRAINAGE HILL

1" (2.54 cm)

PLAYING SURFACE

SIDEVIEW

4. Insert rebar (10) through holes in ground tube assembly (2) as shown.

2

10

10

10

ID# M88604C1

08/06

6

Page 6
Image 6
Spalding M88604C1 manual Side View, Build drainage hill