Installation/Operation Supplement

120 Pound Tumblers

2

1

11

 

 

12

 

6

3

 

 

 

 

4

 

 

13

10

 

5

9

 

 

8

 

 

7

 

 

6

 

TMB2014N

 

 

TMB2014N

NOTE: Refer to Table 3 for sizing of steam lines. Piping must also be sized accordingly for length of runs and number of elbows.

1

Supply

 

8

457 mm (18 in.) Drop

2

305 mm (12 in.) Riser

9

Solenoid Valve (Supplied with machine)

3

Shut-Off Valve

 

10

Steam Bonnet

 

4

Condensate Return Line from Supply Line

11

Flexible Line

 

5

Return

 

12

Union

 

6

Check Valve

 

13

Trap with Built-in Strainer

7

Vacuum Breaker (optional)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 3

 

 

 

 

 

 

 

 

 

 

 

 

 

Model

 

Steam Pressure

 

Minimum Pipe Diameter

 

Steam Trap Size*

 

 

bar (PSI)

 

 

(Pounds Condensate/Hour)

 

 

 

 

 

 

 

 

 

 

8.3 - 8.6 (120-125)

 

1 in. NPT

 

345

 

120S

 

 

 

 

 

 

 

 

4.1 - 8.3 (60-120)

 

1 in. NPT

 

345

 

 

 

 

 

 

 

 

 

 

 

2.4 - 4.1 (35-60)

 

1-1/4 in. NPT

 

345

 

 

 

 

 

 

 

 

 

*Based on maximum PSI.

Table 3

20

© Published by permission of the copyright owner – DO NOT COPY or TRANSMIT

M414881 (EN)