Installation/Operation Supplement

170 Pound Tumblers

1

SUPPLY

2

8

9

3

7

10

 

RETURN

 

6

 

2

 

5

 

4

 

3

 

TMB2024N

NOTE: Refer to Table 4 for sizing of steam lines. Piping must also be sized accordingly for length of runs and number of elbows.

1

Risers 305 mm (12 in.)

6

457 mm (18 in.) Drop

2

Shut-Off Valve

7

Steam Bonnet

3

Check Valve

8

Solenoid Valve (Supplied with machine)

4

Vacuum Breaker (optional)

9

Union

5

Condensate Return Line from Supply Line

10

Trap with Built-In Strainer

Figure 4

Model

Steam Pressure

Minimum Pipe DiameterSteam Trap Size*

bar (PSI)

(Pounds Condensate/Hour)

 

 

 

 

 

 

 

7.5 - 8.6 (110-125)

1 in. NPT

517

170S

 

 

 

4.1 - 7.5 (60-110)

1-1/4 in. NPT

517

 

2.4 - 4.1 (35-60)

1-1/2 in. NPT

517

 

 

 

 

* Based on maximum PSI.

Table 4

M414881 (EN)

© Published by permission of the copyright owner – DO NOT COPY or TRANSMIT

21