Installation/Operation Supplement

2

1

11

 

12

6

3

4

13

5

10

9

8

7

6

TMB2014N

TMB2014N

NOTE: Refer to Table 2 for sizing of steam lines. Piping must also be sized accordingly for length of runs, and number of elbows.

1

Supply

8

457 mm (18 in.) Drop

2

305 mm (12 in.) Riser

9

Solenoid Valve (Supplied with machine)

3

Shut-Off Valve

10

Steam Bonnet

4

Condensate Return Line from Supply Line

11

Flexible Line

5

Return

12

Union

6

Check Valve

13

Trap with Built-In Strainer

7Vacuum Breaker (Optional)

Figure 3

Steam Pressure bar (PSI)Minimum Pipe DiameterSteam Trap Size*
(Pounds Condensate/Hour)

 

 

 

 

 

5.3 - 6.9 (80-100)

3/4 in. NPT

160

 

 

 

* Based on 100 PSI.

Table 2

20

© Published by permission of the copyright owner – DO NOT COPY or TRANSMIT

M414884 (EN)