Installation
The fluid cooler must be located at such distance and direction to Warningavoid the possibility of contaminated fluid cooler discharge air be-
ing drawn into building fresh air intake ducts. The purchaser should obtain the services of a Licensed Professional Engineer or Registered Architect to certify that the location of the fluid cooler is in compli- ance with applicable air pollution, fire and clean air codes.
Fluid Cooler Shipment
Unless otherwise specified, the MH Fluid Cooler ships by truck (on flat bed trailers), which lets you receive, hoist, and install the tower in one continuous operation.
Responsibility for the condition of the fluid cooler upon its arrival belongs to the
Receiving Fluid Cooler
Prior to unloading the fluid cooler from the delivering carrier, inspect the shipment for evidence of damage in transit. If damage is apparent, note the freight bill accordingly. This will support your future recovery claim.
Find and remove the installation instruction drawings and bills of mate- rial located in a plastic bag in the water collection basin. This information should be kept for future reference and maintenance purposes.
Hoisting Fluid Cooler
All MH Fluid Cooler models must use hoist clips and overhead lifting for handling assembled fluid cooler. Forklifting from base of fluid cooler is not permitted. The clips for the top modules are located at the fan deck level. The clips for the lower modules are located at the bottom of the modules at the water collection basin. A