Installation
It is essential that the fan cylinder and fan guard be installed in ac- cordance with the drawings shipped with the tower. Do not force the fan cylinder out of round.
4.Momentarily bump (energize) the motor(s) and observe rotation of the fan(s). If rotation is backwards, shut off the fan and reverse two of the three primary leads supplying power to the motor.
If tower is equipped with a
5.Run the motor and observe the operation of the mechanical equip- ment. Operation should be stable, and, if equipped, there should be no evidence of oil leakage from the Geareducer.
6.If equipped with belt drive check the torque on the fan and motor sheave after 10 - 60 hrs. of operation. See Bushing Fastener Torque Values on page 25.