ASSEMBLY INSTRUCTIONS
IMPORTANT STUDY THE ABOVE ILLUSTRATION AND READ ALL OF STEP 11 "a" through "g" |
BEFORE ATTACHING PEDALS AND CONNECTING LINKAGES.
STEP 11
NOTE: The RIGHT PEDAL(32) has R marked on the bottom side of the pedal. The LEFT PEDAL(31) has L marked on the bottom side of the pedal. Both PEDALS(31, 32) have RIGHTHAND THREADS. Tighten both PEDALS(31, 32) by turning clockwise.
a.Push PEDAL BUSHINGS(33), with SHOULDER facing outside, into LINKAGE CONNECTORS(75).
b.Insert PEDAL SHAFTS of PEDALS(31, 32) through SHOULDER side of PEDAL BUSHINGS(33).
c.Slide SPACERS(34) onto PEDAL SHAFTS.
WARNING: SPACERS(34) must be between PEDAL BUSHINGS(33) and CRANK(10) so that there will be enough clearance between LINKAGES(9, 74) and CRANK(10).
d.Thread PEDAL SHAFTS of PEDALS(31, 32) into CRANK(10) and tighten.
e.Hold PEDAL SHAFTS with wrench and thread THIN
f.Tighten PEDAL SHAFTS and THIN
CRANK(10).
g.Connect the LINKAGES(9, 74) to the LINKAGE CONNECTORS(75) with the LOCKING PINS(76).
STEP 12
Install two "AA" batteries into the MONITOR(47), two batteries included. Plug the SPEED PICKUP WIRE(23) into the MONITOR(47). Slide the MONITOR(47) onto the BRACKET on the MAIN FRAME(1). See page 11
for detailed battery installation instructions. | 9 |
|