Sterling 1-Pump 5-Station Controller Installation, Installing the SCC1-5Q Control Panel

Models: 1-Pump 5-Station Controller

1 39
Download 39 pages 455 b
Page 20
Image 20

4

Installation

 

 

4-1 Installing the SCC1-5Q Control Panel

Note: Before you mount the panel, consider how you run wiring to the vacuum receivers, the filter chamber atmospheric valve (if so equipped) and the pump motor starter(s), vacuum switch(es), and vent valve(s).

Mount the panel on a flat, vertical area. It should be a visible area that gives your operator access to the control. The panel requires a low voltage power drop as listed on the serial tag.

4-2 Making Electrical Connections

Refer to local electrical codes, the schematic and connection diagrams supplied with this unit and the serial tag for wiring considerations. Run all wiring in conduit if codes require it.

4-3 Making SSC1-5Q Control Panel Power Drop Wiring Connections

Hardwire the input power at 110/1/50-60 VAC or 230V/1/50- 60 VAC, depending on the specifications, which are located on the SSC1-5Q Control Panel Serial Tag. The main power switch is located on the right side of the enclosure.

Important! Sterling recommends that you protect PLC memory by providing the control panel with a dedicated circuit, a true earth ground, and a spike/surge protector.

4-4 Connecting the Control Panel to Vacuum Receivers

1.On 24 VDC control voltage systems, run a common +24 VDC wire and a common 0 (zero) VDC wire from the controller to each vacuum receiver in the SSC system.

2.On all systems, run two wires to each vacuum receiver: one each from the controller to the Bin-Full switch (LS) and to the Atmospheric/Sequence-T solenoid (SOL) valve.

3.Make sure that the solenoid and the proximity switch (if supplied) on vacuum receivers are the same voltage (24

Page 19 of 38

Page 20
Image 20
Sterling 1-Pump 5-Station Controller Installation, Installing the SCC1-5Q Control Panel, Making Electrical Connections