SSV 05/2R
4.1. Preparations
Check whether the injector tubes are inserted in the material to be conveyed.
Switch on the
Switch on the conveyor unit at the control and maintenance unit.
The conveyor unit should now convey until the conveyor hopper is filled up to the level probe.
4.2. Setting the mixing ratio of the components
The mixing ratio of the components is adjusted on the pressure reducers.
&
The adjustment on the pressure reducers will vary according to the material, flow properties, particle size and conveying distance.