Sterling SSV 05/2R Preparations, Setting the mixing ratio of the components

Models: SSV 05/2R

1 35
Download 35 pages 12.75 Kb
Page 23
Image 23

SSV 05/2R

4.1. Preparations

Check whether the injector tubes are inserted in the material to be conveyed.

Switch on the compressed-air supply.

Switch on the conveyor unit at the control and maintenance unit.

The conveyor unit should now convey until the conveyor hopper is filled up to the level probe.

4.2. Setting the mixing ratio of the components

The mixing ratio of the components is adjusted on the pressure reducers.

&

The adjustment on the pressure reducers will vary according to the material, flow properties, particle size and conveying distance.

SM4-610

Set-up 22

Page 23
Image 23
Sterling operating instructions SSV 05/2R Preparations, Setting the mixing ratio of the components