Sterling SSV 05/2R operating instructions Set-up

Models: SSV 05/2R

1 35
Download 35 pages 12.75 Kb
Page 25
Image 25

SSV 05/2R

4.3.1. Fine adjustment of the filling level in the conveyor hopper

&

Before the fine adjustment, carry through a basic adjust- ment.

During operation, carefully turn the adjustment screw (A) of the level probe by means of a screwdriver until the desired fill-

ing level is reached.

 

 

A

 

&

Clockwise rotation makes

 

 

 

 

 

the filling level fall.

 

 

Counterclockwise rotation makes the filling level rise.

 

 

 

 

 

If the filling level in the conveyor hopper cannot be lowered far enough by means of the level probe, the pressure on the control and maintenance unit can be re- duced step by step.

SM4-610

Set-up 24

Page 25
Image 25
Sterling SSV 05/2R operating instructions Set-up