12
E. Push auger into freezing cylinder and rotate slowly
until auger engages the drive shaft.
F. Insert spigot body into front door.
NOTE
When inserting spigot body, press o-rings in to pre-
vent damage.
G. Turn spigot body until the ice breaker bar can be
inserted. Insert breaker bar and rotate spigot
body 90°.
H. Install auger support bushing onto front door so
beveled edge of bushing is against door.
I. Install the white stator support bushing onto the
rear of the stator bar and insert stator into spigot.
J. Insert torque rod. The rod should be placed through
the hole in stator bar.
K. Install the front door onto the freezer.
NOTE
When installing door onto freezer, torque rod must
be placed in the center of metal torque actuator arm
L. Install the knobs on the freezer studs.
M. Look for the proper seal between the freezing
cylinder, quad ring, and front door
N. Insert spigot handle so hole lines up and insert
spigot pin.
O. Install the mix inlet regulator into the hopper if
using shake mix. If using slush mix, the mix inlet
regulator is not required.
P. Install hopper cover, drain tray, drip tray, and drip
tray grid.
3.12 ROUTINE CLEANING
To remove spilled or dried mix from the freezer exterior,
wash in the direction of the finish with warm soapy water
and wipe dry. Do not use highly abrasive materials as they
will mar the finish.
3.13 PREVENTIVE MAINTENANCE
Stoelting recommends that a maintenance schedule be
followed to keep the freezer clean and operating properly.
CLEANING AND SANITIZING INFORMATION
Special consideration is required when it comes to food
safety and proper cleaning and sanitizing.
The following information has been compiled by Purdy
Products Company, makers of Stera-Sheen Green Label
Cleaner/Sanitizer and specifically covers issues for clean-
ing and sanitizing frozen dessert machines. This informa-
tion is meant to supplement a comprehensive food safety
program.
figure 3-9 Door and Stator Assembly
Torque
Rod
Auger
Support
Bushing
Stator Bar
O-Ring
Stator Bar
Bushing
Quad
Ring
Stator Bar
CAUTION
Do not place the mix inlet regulator into the hopper
before installing the auger. Attempting to install the
auger with the mix inlet regulator in place will dam-
age the regulator.