SCT SERIESTROWEL — ASSEMBLY AND INSTALLATION

Assembly and Installation

Before the trowel can be put into operation there are some components that must be installed before the trowel can be used. This section provided general instructions on how to install those components.

Handle Tube Installation

1.Install the handle tube to the gearbox as shown in (Figure 5). The mounting hardware should be contained in the shipping container.

2.Connect the throttle cable to the engine. (Figure 7). (The air cleaner housing may have to be removed to provide access for throttle cable installation.) When connecting the cable housing, make sure that no more than 1/4" (6.4mm) of the cable housing protrudes past the housing clamp on the engine.

Figure 7. Throttle Cable Connection

Figure 5. Handle Tube Installation

Throttle Cable Installation

1.Set the throttle (Figure 6) to the idle position (lever away from the operator).

3.Tighten cable clamp screw.

4.After the cable has been installed on the engine, work the throttle lever to verify the throttle cable is at the proper length. Adjust the cable as necessary.

5.Reinstall the air cleaner housing if previously removed.

Figure 6. Throttle

PAGE 18 — SCT SERIES WALK-BEHIND TROWEL— PARTS & OPERATION MANUAL — REV. #4 (04/02/07)

Page 18
Image 18
Stow SCT46, SCT36 operation manual Assembly and Installation, Handle Tube Installation