Sub-Zero UC15IO manual Installation Checklist, Door Stop, Hinge Cover Installation

Models: UC15IO

1 16
Download 16 pages 50.38 Kb
Page 14
Image 14
90° DOOR STOP

Ice Machine Installation

14

 

 

Installation

90° DOOR STOP

Door stop pins provided with the ice machine will limit the door swing to 90°. Follow these steps to install:

1)Open the door to approximately 80°.

2)Insert the stop pin into the bottom door hinge (pin enters from the top). Refer to the illustration below. The pin must be inserted until the head has made contact with the hinge body.

3)Insert the stop pin into the top door hinge (pin enters from the bottom).

4)Check for proper operation.

HINGE COVER INSTALLATION

Install the hinge covers after installation of the ice machine is complete. The 90° door stop must be installed prior to installing the hinge covers. It will be necessary to remove the knock-out in the hinge cover when the 90° door stop is used.

Make sure hinges are free of dirt or grease before applying covers. To install, remove backing paper from the adhesive pads and bond to the hinge. Attach the magnetic center covers. Refer to the illustration below.

Installation Checklist

To ensure a safe and proper installation, the following checklist should be completed by the installer to ensure that no part of the installation has been overlooked.

INSTALLATION CHECKLIST

Have all electrical and water connections been made?

Is the power cord plugged into a properly grounded

3-prong outlet, which has been installed in accordance with all applicable electrical codes?

Is the water supply turned on? Have water supply and drain connections been examined for leaks?

Is the ice machine drain line routed to an open site drain for gravity drains and according to instructions for drain pump models?

Has all packing materials and tape been removed?

Is the ice machine level? Are all leveling legs making contact with the floor?

Has the kickplate been installed properly? Is there proper clearance in front of the kickplate for airflow?

If applicable, is the door panel installed properly?

If applicable, has the 90° door stop been installed?

Have hinge covers been installed?

Has the ice machine and bin been sanitized?

DOOR STOP PIN HINGE COVER INSTALLATIONInstallation ChecklistINSTALLATION CHECKLIST

KNOCK-OUT Manual backgroundManual background

90° door stop.

Hinge cover installation.

Does the customer understand the unit's operation and maintenance? Have you given the customer the warranty package?

Have any installation or service problems been noted on the product registration card? Has the registration card been mailed in?

If applicable, has the stainless steel door panel been inspected for any imperfections? This is to be done by the dealer or installer with the customer upon comple- tion of the installation. Stainless steel panels are covered by a limited 60-day parts and labor warranty for cosmetic defects.

Page 14
Image 14
Sub-Zero UC15IO manual Installation Checklist, Door Stop, Hinge Cover Installation, Ice Machine Installation